SFWMD Everglades Reconstruction Project

Home > Projects > SFWMD Everglades Reconstruction Project

SFWMD Everglades Reconstruction Project

CES Consultants, Inc. has been providing miscellaneous engineering services to the South Florida Water Management District since 2002, for a variety of civil works engineering projects. Specific services have included the following civil engineering and related services:

  • Design of a 220cfs pump station discharging into the C-1 Canal, and a 200cfs Flow Structure for section 24 of the ACME Basin.
  • Design of a 170cfs temporary pumping station and a permanent 370cfs pump station as part of the District’s Acceler8 Program.
  • Primavera P3e baseline schedule development per Work Breakdown Structures in compliance with District and U.S. Army Corps standards, for the development of the Everglades Agricultural Areas Project Implementation Report.
  • Structural engineering and site civil design services to bring existing pumping stations in compliance with the latest requirements of the South Florida Building Codes for a 200mph storm event.
  • Canal conveyance inspections and design services
  • Cost engineering and cost estimating services for a variety of civil, environmental and structural engineering projects.

In addition to the above listed engineering consulting services, CES staff have also provided document control, GIS services and project management support to the District, working under District staff supervision.