Miramar water main improvements

The City of Miramar, in an effort to provide its residents with the best water service, identified sectors of the city requiring upgrades to the existing water mains as part of the East Miramar Redevelopment Transmission & Distribution Water Main Project. The deficiencies identified in these areas included inadequate fire protection, low service pressures, and an aging infrastructure.

CES was contracted to design approximately 72,000 L.F. of 6-inch water main and provide other design services for the City of Miramar, including a directionally drilled 8-inch Ductile Iron Pipe section of 120 L.F. main.  The new design improved fire protection for the City’s neighborhoods, which were at the time serviced by 2-inch and 4-inch water mains. CES was also tasked with locating fire hydrants to be connected to existing water mains with a diameter of 6 inches or greater. Upon construction, the end result will give residents essential fire protection, increased water flow in the City, and better water pressure to homes and businesses in the area. The project is bound by Pembroke Rd., the Florida Turnpike, University Drive, and SW 68th Avenue.

The CES design team will maintain frequent communication with the client to discuss the project’s progress and ensure the client’s expectations are met.

Services Provided:

  • Route Analysis

  • Design and Plans Preparation

  • Development of Contract Specifications

  • Water Master Plan for Project Area

  • Striping & Pavement Marking Inventory

  • Existing Utilities & Future Project Coordination

  • Permitting

  • Construction Phase Services